Outdoor and garden: get the base right before the finish
Four tools, one shared failure mode: the visible layer gets counted and the buried layer does not. Gravel and paver base sit under the finish, fence posts sit under the ground, and mulch sits on top of soil that decides how much you need next spring.
Pick the tool
Each one is free, works in imperial or metric, and prints a shopping list you can take to the yard.
Fence calculator
Posts, rails, pickets, panels and concrete for the run you measure.
Adds 8 ft against 16 ft rails: how many, how much waste, what it costs Yard · GravelGravel calculator
Cubic yards, tons and bags for a drive, a path or a bed at the depth you set.
Adds bulk against bagged, with the break-even tonnage printed on the page Hardscape · PaversPaver calculator
Pavers, base gravel and bedding sand for a patio or walk, layer by layer.
Adds the border course as its own line: 88 pavers that field-only math misses Yard · MulchMulch calculator
Yards and bags for a bed, plus what the delivery fee adds per yard.
Adds cost per year at 1, 2, 3 and 4 inches — not just this spring's bag count Yard · SoilSoil calculator
Cubic yards, 40 lb bags and tons of topsoil, garden mix or compost for the depth you set.
Adds settling: order about 10% over the volume you measureSold by the yard, the ton or the bag — and they do not interchange
Bulk material arrives by volume, is priced by weight, and is bagged at a third of the price per unit.
Gravel and paver base are ordered in cubic yards but weighed in tons, and the conversion depends on density — roughly 1.35 tons per yard for crushed stone, less for lighter aggregate. Mulch is the light one: about 0.4 tons per yard, which is why bulk mulch usually wins once you pass two or three yards. Pavers are sold by the piece and priced by the square foot, with the base and bedding sand bought separately underneath.
Fence is the odd one out: counted in posts and pickets, not volume, with a concrete bag count per post hole. A gate opening removes a span of rails but adds post pairs and usually deeper footings.
| Material | Ordered in | The buried cost |
|---|---|---|
| Gravel | Cubic yards, billed by ton | Depth is the whole number — 3 in over 200 sq ft is 1.85 yd³ |
| Mulch | Cubic yards or 2 cu ft bags | Depth decides how often you rebuy it |
| Pavers | Pieces, plus base and sand | 4 in compacted base, 1 in bedding — both counted |
| Fence | Posts, rails, pickets, bags | One 50 lb bag per post is a starting assumption, not a rule |
Delivery fees flip the bulk-versus-bagged maths more often than people expect. On a small bed, the delivery charge alone can cost more than the bag premium — each tool prints the break-even so you can see where the line falls.
Related guides
Long-form walkthroughs that go past the formula, with worked examples and the mistakes that cost the most.
Then stack it with the rest of the house
This tool gives you the order for one job. Save it to a project and the same page adds up several rooms, tracks what is still unbought, and records what you actually paid against the estimate.