Flooring and tile: pick the surface, then the box count
Both tools answer the same question from opposite ends — how much surface you are covering, and how much of it the cut pile eats. Flooring is sold by the box and tolerates a 5 percent waste factor. Tile is sold by the box, cut at the edges, and needs thinset and grout on top of the tile itself.
Pick the tool
Each one is free, works in imperial or metric, and prints a shopping list you can take to the yard.
Flooring calculator
Boxes of plank flooring for the room you actually have, stairs and baseboard included.
Adds direction: planks lengthwise 14 boxes, crosswise 15 — one box apart Interiors · TileTile calculator
Tiles, boxes, thinset and grout for one room, with the cut count at the edges.
Adds three lay patterns priced side by side: 6 boxes straight, 7 diagonal Floor · CarpetCarpet calculator
Square yards, strips and padding for a room on a 12 or 15 ft roll.
Counts the strips, and the roll width the room throws away Wall · WallpaperWallpaper calculator
Double rolls from the strip count at your wall height and pattern repeat.
A 24 in repeat drops strips per roll from 4 to 3 — the usual quote errorThe decision that changes the number
Which tool you open depends on what is going on the floor, not on the room size.
Plank flooring goes down as a floating or glued layer over a flat subfloor and is forgiving of a doorway that is half an inch off. Tile is bonded to the substrate with thinset and cannot absorb movement, so a floor that flexes will crack grout lines regardless of how well you counted the boxes. Wet rooms, entryways and kitchens lean tile; bedrooms, living rooms and stairs lean plank. If the substrate is uneven, the tile number is the least of your problems — fix the floor first, then open the calculator.
| What changes | Flooring | Tile |
|---|---|---|
| Sold by | Box of planks, 24.4 sq ft typical | Box of tiles, 15 tiles at 12 × 12 |
| Waste factor | 5% along the long wall, 8% across | 10% plus a counted cut pile at the edges |
| Extra materials | Underlayment, baseboard, transition strips | Thinset, grout, spacers, a wet saw blade |
| Where the number goes wrong | Stairs and closets skipped | Diagonal layouts cut 30% more than straight |
One practical rule survives both tools: keep a full unopened box from the same lot. Dye lots differ, and a mid-job shortage means a visible seam where the second order starts.
Related guides
Long-form walkthroughs that go past the formula, with worked examples and the mistakes that cost the most.
Then stack it with the rest of the house
This tool gives you the order for one job. Save it to a project and the same page adds up several rooms, tracks what is still unbought, and records what you actually paid against the estimate.