Walls and paint: the board comes before the coat

Drywall sets the surface and the paint covers it, but the two numbers are computed separately and then added to the same budget. Get the order right: board count, joint compound and tape, then paint and primer. Painting a wall you still have to re-board is the most expensive sequence error on a renovation.

Pick the tool

Each one is free, works in imperial or metric, and prints a shopping list you can take to the yard.

They share a surface but not a unit

The drywall number is a board count; the paint number is a liquid volume. Neither converts into the other.

Drywall is counted in sheets because a 4 × 8 board covers 32 sq ft only if it lands without a cut. Wall height decides which board length wastes least: an 8 ft wall takes 4 × 8 boards, a 9 ft wall is cheaper on 4 × 10, and a 12 ft wall only divides cleanly on 4 × 12. That is why the drywall tool asks for height and width rather than area alone.

Paint is counted in gallons because coverage is a rate, not an area. One gallon covers roughly 350 sq ft of interior wall on a smooth, primed surface — and noticeably less on a porous or textured one. Coats multiply, doors and windows subtract, and primer is a separate line item that is easy to skip until the first coat flashes through.

StepCount withWatch for
1. BoardDrywall calculatorCeiling included or not — it is a separate 120 sq ft on a 12 × 10 room
2. JointsSame tool, mud and tape linesMud follows joint length, not sheet count
3. PrimerPaint calculator, primer lineNew drywall absorbs the first coat; do not skip it
4. TopcoatPaint calculator, coats + wasteDoors 21 sq ft, windows 15 sq ft — trim still gets painted

Related guides

Long-form walkthroughs that go past the formula, with worked examples and the mistakes that cost the most.

Then stack it with the rest of the house

This tool gives you the order for one job. Save it to a project and the same page adds up several rooms, tracks what is still unbought, and records what you actually paid against the estimate.

Project planner
Press "Add to project" under any purchase card. Quantities stay editable, every line keeps its own status, and nothing is uploaded anywhere.
Open the project planner