A 20 by 10 foot driveway at 3 inches is 1.85 cubic yards of stone — and that single number can be bought four different ways at four different prices. Here is the arithmetic, and where the bagged option stops making sense.

TallyReno build desk Reviewed 19 November 2026 10 min read
Two landscaping laborers raking and shoveling a freshly dumped load of grey crushed gravel level across a residential driveway.
Two yards of stone is 2.75 tons. It arrives all at once and it never looks like enough until it is spread.

Gravel is the cheapest material in this series and the one people most often get wrong, because it is the only one sold by three units at once. A stone yard quotes you cubic yards. A bag quotes you cubic feet. A truck driver talks in tons. Those three are not interchangeable, and the gap between them is big enough to change what you order.

Start with the volume, because volume is what the job actually needs. Everything else is a conversion you have to survive.

1. The three numbers you need

Any gravel quantity comes from three inputs, and only one of them is a judgement call:

Area times depth gives cubic feet. Divide by 27 and you have cubic yards, which is what the yard sells. Multiply cubic yards by the density and you have tons, which is what the truck weighs.

Worked example — a 20 x 10 ft driveway at 3 inches

200 sq ft x 0.25 ft = 50 cubic feet. Divide by 27 = 1.85 cubic yards.

Add 10 percent for compaction and spillage = 2.04 cubic yards, which the yard will round to 2.5 because they sell in half-yard steps.

In bags that is 110 bags of 0.5 cubic feet. In weight it is 2.75 tons at 1.35 tons per yard.

Note the number that appeared in the middle: 1.85 cubic yards of loose stone becomes 2.04 because gravel settles. That 10 percent is not a fudge factor, it is the difference between a driveway that finishes level and one that needs a second trip.

2. Depth is the number you decide, and 3 inches is usually wrong

The default depth in almost every online gravel calculator is 3 inches, and for a driveway it is about an inch and a half too thin. Depth has to match what is underneath and what will drive on it:

ApplicationDepth20 x 10 ft needsWhy
Decorative bed, mulch replacement1–2 in0.6–1.2 ydCover only, no load
Garden path, foot traffic2–3 in1.2–1.9 ydHands and barrows
Driveway over a prepared base3–4 in1.9–2.5 ydCar tyres, one layer
Driveway over bare soil4–6 in2.5–3.7 ydBase layer plus surface
Parking pad, occasional heavy vehicle6–8 in3.7–5.0 ydPoint loads

The last row of that table is why 3 inches fails. A driveway over bare soil needs two layers: a base of larger crushed stone, 3 to 4 inches, compacted, and a surface of smaller stone on top. Ordered as a single 3 inch layer of one stone, the material simply sinks into the subgrade under the first wet season and you buy the difference again next spring.

Depth is also the most expensive mistake in the whole order, because cost scales linearly with it. Going from 3 inches to 5 inches on this driveway is 1.85 yards to 3.09 yards, which is about $77 of stone to about $117 — not fatal, but only if you got the first number right. Order 3 inches because a calculator said so, then discover you needed 5, and the second order carries a second delivery charge that is larger than the stone.

A tipper truck raising its bed to dump grey crushed gravel onto a residential driveway while a laborer stands to the side with a shovel.
The truck measures in tons, the yard in cubic yards, the bag in cubic feet. Depth is the only input you actually choose.

3. Yards, tons and bags are three different questions

Here is the part that surprises people. A cubic yard of loose crushed stone weighs about 2,700 pounds. A bag of gravel sold as 0.5 cubic feet and 40 pounds implies a density of 80 pounds per cubic foot — about 2,160 pounds per cubic yard. That is 20 percent lighter than the same volume at the yard.

Both are honest. The bag is not lying about its volume and the yard is not lying about its weight. What differs is how the stone is packed: the yard's pile has been loaded and dropped and contains more fines and more contact between stones, while the bag is a loose scoop sealed at the factory. But the practical consequence is real: 54 bags make one cubic yard by volume and weigh 2,160 pounds, while one cubic yard from the yard weighs 2,700. If you plan a job in bags and then size a base for it, you have 20 percent less stone than the volume suggested.

The rule that avoids all of this: convert everything to cubic yards first, then compare prices in dollars per cubic yard. A bag at $5.50 for 0.5 cubic feet is $297 per cubic yard. Bulk stone at $38 per cubic yard is eight times cheaper before you have paid a single delivery fee.

Weight matters when you are collecting it yourself, because that is where the vehicle becomes the constraint. 2.04 cubic yards of crushed stone is 2.75 tons. A half-ton pickup with a 1,000 pound payload cannot take a third of it. A 10 foot utility trailer rated at one ton needs three trips. Three trips at 40 minutes each is a two hour afternoon, which is the real cost of skipping the delivery.

A laborer pushing a loaded steel wheelbarrow of crushed gravel along a half-finished gravel driveway.
Collecting it yourself is three trailer trips and two hours. That is the real price of the delivery fee you saved.

4. Bulk or bagged: the break-even is lower than you think

The comparison people expect is a simple one, and the arithmetic is less friendly than the intuition. Take typical 2026 numbers: bulk crushed stone at $38 per cubic yard, a delivery charge of $95 on orders under 5 yards, and bagged stone at $5.50 for a 0.5 cubic foot bag, which is $297 per cubic yard.

break-even = delivery / (bagged_per_yd - bulk_per_yd) = 95 / (297 - 38) = 0.37 cubic yards

That is ten cubic feet. Twenty bags. Below that quantity, bagged stone is genuinely cheaper, because the delivery charge is larger than the saving on the stone. Above it, the bulk price wins by a margin that grows fast: at 2.04 yards the difference on this driveway is $605 bagged against $190 bulk, delivered.

But break-even is not the same question as availability, and this is where real orders get decided. Many yards have a 5 cubic yard minimum for delivery, or charge the full delivery fee regardless of load size. So a job that needs 2 yards has three honest options:

OptionWhat you payWhat you getCatches
Bagged, 110 bags$605exactly 2.04 yd110 trips to the car
Bulk, 2.5 yd delivered$1900.46 yd spareminimum may force 5 yd
Bulk, collected yourself$952.5 yd in 3 tripstwo hours and a trailer

Two things about that middle row. First, the yard sells in half-yard steps, so 2.04 becomes 2.5 — you pay for 0.46 yards you may not use, which is $17 and not worth arguing about. Second, if the minimum is 5 yards, buying 5 for a 2 yard job costs $190 in stone and leaves you a pile in the way for a year. In that case collect it yourself, or find a yard with no minimum.

Where bagged stone does win, legitimately: a single flower bed, a dry creek feature of 30 square feet, a repair where you need four bags and a car boot. And small quantities of a special stone — black Mexican beach pebble, white marble chip — are bagged-only, because no yard stocks them in bulk.

A loose mound of grey crushed gravel beside a pallet of sealed gravel bags in a builders yard.
Same stone, same volume: 54 bags make a cubic yard and weigh 2,160 lb. A yard from the pile weighs 2,700.

5. What the calculator cannot see: fabric, base and edge

Three items belong to the same job as the stone and are routinely forgotten, each of them priced on a different measure than the gravel itself.

Weed fabric goes under the stone, on the area, not on the volume. A 20 by 10 foot bed needs 200 square feet of fabric; a standard roll is 3 by 50 feet, or 150 square feet, so two rolls with 100 square feet spare. Fabric is what stops stone migrating down into the subgrade, and it is the reason a gravel path stays a path instead of becoming a line of buried pebbles within two seasons. Skip it over soil and you have bought stone that will be half gone in a year.

Edge restraint goes on the perimeter. A 20 by 10 foot area has 60 feet of edge. Timber edging in treated 2 by 4 comes in 8 foot lengths, so 60 feet is eight boards. Steel edging is sold by the linear foot and is about three times the price. Without an edge, a loose gravel surface spreads outward every time it is driven on, and the driveway you graded in April is two feet wider and one inch thinner by July.

Compaction is free but it changes the number you order. Loose stone settles roughly 10 to 15 percent under a plate compactor, and more than that if it is simply driven over. That is what the 10 percent allowance in the worked example is paying for. Lay it in two inch lifts rather than one deep layer: a 4 inch layer compacted from the top leaves the bottom four inches loose, and the surface will rut where the loose zone sits.

One more thing a calculator will never ask: drainage. Gravel over soil needs a fall of about 2 percent away from the building, which is a quarter inch per foot. On a 20 foot run that is 5 inches of height across the width. If the site is flat, the stone has to go somewhere, and if it cannot drain it becomes a puddle with stones in it.

6. The whole order, priced

ItemQuantityBasisCost
Crushed stone, 3/4 in2.5 cu yd2.04 rounded to half yards$95
Delivery1 loadflat fee under 5 yd$95
Weed fabric2 rolls200 sq ft of bed$38
Timber edging8 x 8 ft60 ft of perimeter$56
Materials total$284

The stone is barely a third of that total. This is the pattern with gravel everywhere: the material is cheap, the logistics and the supporting items are not. Which also means the lever worth pulling is not the price per yard, it is whether you need a delivery at all.

7. What to ask the yard before you order

Five questions, and each of them changes the number you write down:

  1. Is that price per cubic yard or per ton? A quote of $38 that is actually per ton is $51 per yard at 1.35 tons, which is a third more than you thought.
  2. What is the minimum for delivery? Some yards deliver 1 yard, some want 5. This single answer decides whether bagged stone is rational for your job.
  3. Do you sell in half yards? If not, 2.04 yards becomes 3 and you have paid for a yard of air.
  4. Is it washed or crusher run? Crusher run includes stone dust and compacts to a hard, almost concrete-like surface — excellent as a base, poor for drainage. Washed stone is clean and drains, but will not bind.
  5. Where can the truck tip? A tandem load needs a clear drop zone. If the driver cannot get within 20 feet of the work, you are moving 2.75 tons with a barrow, and that is the afternoon gone.
The cheapest gravel mistake is ordering a yard too few. The most expensive is ordering a truckload you cannot get to the hole.

8. The short version

Multiply area by depth in feet, divide by 27, add 10 percent, and round up to the nearest half yard. Then convert: 1 cubic yard of crushed stone is about 1.35 tons or 54 bags. Choose depth by what is driving on it and what is underneath — 3 inches for a bed or a path over a base, 4 to 6 inches for a driveway over soil.

For anything above 0.4 cubic yards, price bulk with delivery before you price bags. For anything below, or for a stone no yard stocks, buy bags and skip the delivery charge.

The calculator behind this guide Gravel calculator — cubic yards, tons and bags side by side Enter the area and depth and it returns yards, tons, bag count and a bulk-versus-bagged cost comparison with the break-even point marked. Open the gravel calculator

Questions we get about gravel quantities

How much does a cubic yard of gravel weigh?
About 1.35 tons, or 2,700 pounds, for loose crushed stone. Pea gravel and river rock are lighter at roughly 1.2 tons. Bagged product is lighter again at about 1.08 tons per cubic yard, because it is packed loosely.
How many bags of gravel make a cubic yard?
Fifty-four bags of 0.5 cubic feet, by volume. By weight they add up to only 2,160 pounds against 2,700 for a yard from the stone yard, so the bagged yard is 20 percent lighter in real stone.
How much gravel for a 20 by 10 foot driveway?
At 3 inches, 1.85 cubic yards before compaction and 2.04 after, which is 2.75 tons or 110 bags. At the 4 to 6 inches a driveway over bare soil actually needs, it is 2.5 to 3.7 cubic yards.
Is bagged gravel much more expensive than bulk?
Yes. A bag at $5.50 for 0.5 cubic feet works out to $297 per cubic yard against about $38 bulk. The break-even against a $95 delivery charge is only 0.37 cubic yards, or about 20 bags.
How deep should gravel be for a driveway?
Four to six inches over bare soil, built as a compacted base of larger stone with a surface layer on top. Three inches is enough only over a base that is already sound.
How much gravel do I need per square foot?
At 1 inch depth, about 0.0031 cubic yards per square foot, so 100 square feet needs 0.31 yards. At 3 inches it is 0.0093 per square foot. Roughly 100 square feet at 3 inches is one cubic yard.
Do I need weed fabric under the gravel?
Over soil, yes, on the full area — it stops the stone sinking and stops weeds coming through. Over an existing sound base it is optional, but it still makes future removal far easier.

Next in this series